BLENG BV
STRUCTURAL
ENGINEERING

boslaan 41a

3050 oud-heverlee

0493 24 02 93

mieke.bornauw@bleng.be

BTW BE.697.984.878

  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide

As structural engineers we are always looking for interesting projects. Over 3 decades we have gained experience in stability analysis for variety of structures: water treatment basins (Aquafin), bridges (Flemish Government), residential housing, apartment buildings etcetera. In order to optimize the dimensions of materials, we use the most advanced software. This software is based on finite element analysis.

 

Our approach is as follows. We attend a meeting with the architect in order to exchange architectural drawings and to discuss the structural loads.


After which we will make our calculations which are compliant to the latest EuroCodes. A calculation note can be presented if requested. We provide the client of the necessary structural drawings of formwork and armature to be timely put to tender. Finally we also provide follow-up for the execution of the construction.

Recently

 

  • Underground metro depot incl maintenance area Anderlecht, an administrative building and a technical building for MIVB/STIB (commissioned by Grontmij) - calculation + formwork
  • Three cooling towers for Arcelor Mittal (commissioned by Grontmij) - calculation, formwork and armature
  • Construction of houses / renovation of houses / apartment buildings and residential houses commissioned by - among others - Architectenbureau Van Steenkiste bv - calculation + following up
  • Calculation of a new building for Vivinvest (commissioned by Stubeco), Blok B Persilstraat Herent - 79 appartments + 6 commercial spaces
  • Calculation of a new building for Skyline Europe at Merelbeke (commissioned by Stubeco) - 56 appartments
  • Calculation of a new people care centre for vzw STIJN (commissioned by Stubeco) at Heusden-Zolder - 12 studios
  • Follow-up op project for VMSW Lokeren (commissioned by Stubeco) 19 houses and appartments
  • Calculation and Follow-up of New Serviceflats + Renovation Silos Vaartkom Leuven (commissioned by GD engineering)
  • Calculation Renovation of a Shoppingcomplex and hotel Gent (commissioned by GD engineering)